Friday, February 4, 2011

Dubai Top Companies To Work For

Doka at the Burj al Bahr



The rapid growth of hotels and office towers continues. Hotel prices drop now almost on a weekly basis, and every month there is the opening of new hotels. After the Daewoo JW Mariott, the 4 Points by Sheraton has been open. This increases the number of international hotel chains in Tripoli on half a dozen - and the next follow soon.
One of them will be the "Burj Al Bahr" which is already under construction in the area of Tajura (eastern Tripoli) from the Turkish Summa Group. In addition to a hotel tower, it is also an office tower and a pass for houses. The hotel operator should be Hyatt.
And with this group and the Austrian Doka, which supplies the formwork system, thereby increasing both the safety (I've never felt at a construction site at a dizzying height has never been so sure) and the cost decreases (the system is multiple use). Michael Wanninger (middle right), Country Director of Doka has led the tour and is justly proud of this job.
the way, the tide has its positive side hotel: Corinthia, the first (and long the only one) 5 * hotel in Tripoli, the rates already close to the EUR 200 to come. Only a 1 1 / 2 years, this amounted to EUR 380 ,....

0 comments:

Post a Comment